Trilio for Red Hat Virtualization
4.1
4.1
  • About TrilioVault for RHV
  • TrilioVault for RHV Architecture
  • TrilioVault for RHV 4.1 Release Notes
  • TrilioVault 4.1 Support Matrix
  • Deployment Guide
    • General requirements
    • Certificates required for TVR
    • Preparing the Installation
    • Spinning up the TrilioVault VM
    • Configure TrilioVault VM
    • Installation of RHV extensions
    • Post Installation Health-Check
    • Uninstall TrilioVault
    • Upgrade TrilioVault
  • User Guide
    • Required RHV User roles
    • Workloads
    • Preparing for Application Consistent backups
    • Snapshots
    • Restores
    • File Search
    • Snapshot mount
  • ADMIN GUIDE
    • The appliance service account
    • Configure the TrilioVault appliance login banner
    • Reset the TrilioVault GUI password
    • Shutdown/Restart the TrilioVault Appliance
    • Admin Panel
    • email alerts
    • Reporting
  • Troubleshooting
    • Important TVM Logs
    • Important RHV-Manager Logs
    • Important RHV-Host Logs
Powered by GitBook
On this page
  • Accessing the Admin Panel
  • Admin Panel Overview tab
  • Admin Panel Enable/Disable Global Job Scheduler

Was this helpful?

Export as PDF
  1. ADMIN GUIDE

Admin Panel

The Admin Panel gives Adminstrators a centralized overview of:

  • Snapshots

  • Storage usage

  • protected vs unprotected VMs

In addition does it contain the functionalities to control:

  • Enable/Disable Global Job Scheduler

  • Enable/Disable email alerts

  • Update email alert email list

Accessing the Admin Panel

To access the Admin Panel the following steps need to be followed:

  1. Login into RHV-Manager as a user with admin privileges

  2. In the main menu click on Backup

  3. In the Backup sub-menu click on Admin Panel

Admin Panel Overview tab

The Overview tab of the Admin Panel shows the following information:

  • Graphical overview of how many Snapshots are available, errored or canceled

  • Percentage of Snapshots that are Full Snapshots

  • Graphical overview of used versus free Storage capacity

  • Percentage of how much Storage is available

  • Graphical overview of how many VMs are protected or unprotected

  • Percentage of how many VMs are protected

Admin Panel Enable/Disable Global Job Scheduler

To enable or disable the Global Job Scheduler follow these steps:

  1. Login into RHV-Manager as a user with admin privileges

  2. In the main menu click on Backup

  3. In the Backup sub-menu click on Admin Panel

  4. Move to the Settings Tab

  5. Use the switch to enable or disable the Global Job Scheduler

PreviousShutdown/Restart the TrilioVault ApplianceNextemail alerts

Last updated 4 years ago

Was this helpful?