Every Workload has its own schedule. Those schedules can be activated, deactivated and modified.
A schedule is defined by:
Status (Enabled/Disabled)
Start Day/Time
End Day
Hrs between 2 snapshots
To disable the scheduler of a single Workload in Horizon do the following steps:
Login to the Horizon
Navigate to Backups
Navigate to Workloads
Identify the workload to be modified
Click the small arrow next to "Create Snapshot" to open the sub-menu
Click "Edit Workload"
Navigate to the tab "Schedule"
Uncheck "Enabled"
Click "Update"
To disable the scheduler of a single Workload in Horizon do the following steps:
Login to the Horizon
Navigate to Backups
Navigate to Workloads
Identify the workload to be modified
Click the small arrow next to "Create Snapshot" to open the sub-menu
Click "Edit Workload"
Navigate to the tab "Schedule"
check "Enabled"
Click "Update"
To modify a schedule the workload itself needs to be modified.
Please follow this procedure to modify the workload.
--workloadid <workloadid>
Requires at least one workloadid, Specify an ID of the workload whose scheduler disables. Specify option multiple times to include multiple workloads. --workloadids <workloadid> --workloadids <workloadid>
--workloadid <workloadid>
Requires at least one workloadid, Specify an ID of the workload whose scheduler disables. Specify option multiple times to include multiple workloads. --workloadids <workloadid> --workloadids <workloadid>