Every Workload has its own schedule. Those schedules can be activated, deactivated and modified.
A schedule is defined by:
Status (Enabled/Disabled)
Start Day/Time
End Day
Hrs between 2 snapshots
To disable the scheduler of a single Workload in Horizon do the following steps:
Login to the Horizon
Navigate to Backups
Navigate to Workloads
Identify the workload to be modified
Click the small arrow next to "Create Snapshot" to open the sub-menu
Click "Edit Workload"
Navigate to the tab "Schedule"
Uncheck "Enabled"
Click "Update"
To disable the scheduler of a single Workload in Horizon do the following steps:
Login to the Horizon
Navigate to Backups
Navigate to Workloads
Identify the workload to be modified
Click the small arrow next to "Create Snapshot" to open the sub-menu
Click "Edit Workload"
Navigate to the tab "Schedule"
check "Enabled"
Click "Update"
To modify a schedule the workload itself needs to be modified.
Please follow this procedure to modify the workload.
Trilio is using the Openstack Keystone Trust system which enables the Trilio service user to act in the name of another Openstack user.
This system is used during all backup and restore features.
As a trust is bound to a specific user for each Workload does the Trilio Horizon plugin show the status of the Scheduler on the Workload list page.
--workloadid <workloadid>
Requires at least one workloadid, Specify an ID of the workload whose scheduler disables. Specify option multiple times to include multiple workloads. --workloadids <workloadid> --workloadids <workloadid>
--workloadid <workloadid>
Requires at least one workloadid, Specify an ID of the workload whose scheduler disables. Specify option multiple times to include multiple workloads. --workloadids <workloadid> --workloadids <workloadid>
<workload_id>
ID of the workload to validate